QLD / NT

MATES in Construction QLD/NT

15 May 2025

CONSOLIDATED POWER PROJECTS (HOPELAND PROJECT)

Located in Hopeland, just outside Chinchilla, the Ulinda Battery Energy Storage System (BESS) is a cutting-edge lithium battery storage facility under construction. This site will play a vital role in providing reliable power to Chinchilla and the surrounding communities, enhancing energy stability and sustainability in the region. This project is led by CPP, a South Australian-based company. CPP is also a proud national partner of MATES in Construction.

Since engaging with them, we have rolled out a couple of GAT’s and a Connector Session. Numbers GAT trained on site are around 80, with 10 Connectors. Site ASIST worker and project Manager is Col Stacey, seen in the handover photo with 2 other project management staff.

Recent Articles

Accredited Site

QLD / NT

Besix Watpac

Accreditation to Besix Watpac at the Woodford Juvenile Detention Centre.

Events

QLD / NT

Kokoda 2026

The Kokoda Track stretches 96 kilometres through what is arguably some of the most rugged and wild jungle in the world. This track holds an extremely important place in Australia’s history. In its 7th year, you can be part of raising much needed funds and be part of saving lives in your industry.